Syllabus
OTHER BUILDINGS (Facilities)
Building Name Construction Cost (in lacs)

Cost of Furnishing & Equipments (in lacs)

18. MOSQUE

The mosque will be for the entire campus suitably and centrally located, and the construction though not lavish will be keeping with the Historic significance of the site.

  • Approximately covered area including colonnades 2230 sq meter
  • Present cost of const. 2230x2000/-
  • Cost of Minar
  • Cost of Furnishing 10%

 

 

44.60
10.00

 

 

 

4.46

19. AUDITORIUM FOR 1000 PERSONS CAPACITY

  • Approximately covered area 1859 sq meter
  • Present cost of const. 1859x2000/-
  • Cost of furnishing
  • Cost of equipment

37.18

 

 


4.80
5.00

20. GYMNASIUM

  • Approximately covered area 1859 Sq meter
  • Present cost of const.1869x1000/-
  • Cost of furnishing and equipment 5%

 

18.59
 


1.00

21. STADIUM

10.00

 

22. SWIMMING POOL

  • Approximately covered area. 372 Sq meter
  • Present cost of const. 372x1000/-
  • Cost of filtration plant
  • Cost of swimming pool

3.72
5.00
 

 


1.00

23. PRINTING PRESS

Shed type cost .having 2nd   floor for office use in R.C.C.

  • Approximately are a 2300 sq meter
  • Present cost of const. 2300x1000/-
  • Cost of furnishing and equipment 8.50%

 

 

23.00
 


 

11.50

24. HOSPITAL  (2 STORYED)

150 Bedded ward With O.P.D

  • Approximately covered area 4484 sq meter
  • Present cost of const. 4484×1500/-
  • Cost of furnishing & equipment

 

 

67.26
 


 

11.45

25. BANK. POST OFFICE  &SHOPPING CENTER
  • Approximately covered area 2323 sq meter
  • Present cost of const. 2323×1000/-

 

23.23

 
26. SHOW ROOMS & RESTAURANTS (2 SOREYED)
  • Approximately covered area 6970 sq meter
  • Present cost of const. 6970×1000/-

 

69.70

 

Total  A+B+C

1181 214.97
Grand Total of A+B+C+D Developments 1,396.06

Preparing of Road and paths, planting of trees sewerage disposal, water main, Road lights, Overhead tanks etc. @ 10% of const of const.

114.39

Work charge establishment 1%

13.96

Total

1524.41
Architects fees @ 5% 76.00

Total : say

1,600.00

Note:-
This estimate does not include Cost of Air-conditioning Of some   important building like auditorium. Hospital etc.

 INSTITUTIONAL BUILDING  RESIDENTIAL BUILDING   OTHER BUILDINGS (facilities) 
 ...architects words    
     
 
 