| INSTITUTIONAL BUILDING |
| Building Name |
Construction Cost
(in lacs) |
Cost of Furnishing & Equipments (in lacs) |
1. MAIN UNIVERSITY BUILDING (DOUBLE BUILDING)
Consisting of administrative & teaching accommodation assembly Hall, etc is nearing completion.
- Cost of furnishing @ 10 %
|
|
40.00
4.00
|
2. ADMINISTRATIVE BLOCK (DOUBLE STOREYED)
- Approximately covered area 2788 Sq meter
- Present cost of const.2788 x 1200/-
- Cost of furnishing @10%
|
33.46 |
3.35 |
3. PRIMARY SCHOOL & DARU TAHFIZIL QURAN
Primary school for 400 children has been proposed on ground floor on existing foundation laid earlier for Hostel Block while Darul Tahfiz ul Quran for 400 students have proposed on Ist floor, with common Assembly Hall on ground floor.
- Approximately covered area 2600 sq meter
- Present cost of const. 2600 x 1200/-
- Cost of furnishing @ 10%
|
31.20 |
3.12 |
4. HIGHER SECONDARY SCHOOL (SINGLE STOREYED)
The higher Secondary School is intended to have 800 students in all classes on Ground floor and will provide courses in technical education in various fields. However, future expansion will be taken at First Floor.
- Approximately covered area 4720 sq meter
- Present cost of const. 4720 x 1200/-
- Cost of furnishing & equipment. 20%
|
56.64 |
11.33 |
5. CRAFT TECHNICAL& INDUSTRIAL COLLEGE (THREE STOREYED)
The assumption is that total no. of students will be about 1000.
- Approximately covered area 14164sq meter
- Present cost of construction 14164x 1200/-
- Cost of furnishing & equipment 20%
|
169.00 |
34.00 |
6. CENTRAL LIBRARY (SIX STOREYED)
The building will house 10 lacs volumes complete with microfilm unit, Book bindings and preservation unit.
- Approximately covered area 2900 sq meter
- Cost of construction 2900 x 12000/-
- Cost of furnishing @ 20%
- Cost of air conditioning (partly)
- Procurement of Books, Equipments of microfilm unit
|
-----------------------------
-----------------------------
-----------------------------
-----------------------------
|
6.96
34.80
10.00
50.00 |
Equipment of photo duplication
Equipments of binding etc. |
7. WORKSHOP (SINGLE STOREYED)
It will have shade type construction.
- Approximately covered area 4182 sq meter
- Present cost of construction 4182 x 1000/-
- Cost of equipments @ 15%
|
41.82 |
6.27 |
8. NURSERY SCHOOL (SINGLE STOREYED)
The school is meant for 400 children.
- Approximately covered area 690 sq meter
- Present cost of construction 690 x 1200/-
- Cost of furnishing 10%
|
8.28 |
0.83 |